At just over 28,800 lbs (13,325 kgs), our new cooling tower takes first place as the heaviest single piece of equipment yet to be installed at The Bridge.
Over the summer months, our construction team at ITC Group welcomed additional large-scale equipment deliveries, including The Bridge’s generator and air handling unit.
These machines have big jobs ahead of them – they’ll support The Bridge’s mechanical and electrical systems in providing effective control of the environment inside the building.  Each of The Bridge’s 285 units will have individually-set climates, including air conditioning. This will help people, and their pets, stay cool and comfortable all year round.  To keep spaces healthy and reduce shared air, residents will have their own fresh air intake separate from their neighbors.
For added convenience, our tenants will be able to easily control the temperature in their apartments through their smartphones, thanks to our technology providers at 1Valet.
Learn more about Smart Building Technology